What is it about?
(1) To evaluate the hydropower operation performance, which affected by the uncertainty of medium-range precipitation forecasts, a rolling horizon control model has been constructed. (2) and then the effective forecast horizon and decision horizon are discussed, separately.
Featured Image
Photo by American Public Power Association on Unsplash
Why is it important?
(1) The rolling horizon control model has high availability under uncertainty information conditions. (2) Demonstrate the impact of the uncertainty of inflow information on the efficiency and stability of the hydropower generation
Perspectives
Read the Original
This page is a summary of: Evaluation of the effective forecast and decision horizon in optimal hydropower generation considering medium-range precipitation forecasts, Water Science & Technology Water Supply, July 2019, IWA Publishing,
DOI: 10.2166/ws.2019.095.
You can read the full text:
Contributors
The following have contributed to this page