What is it about?
Establish a risk assessment model of floodwater resources utilization in water diversion project based on fuzzy network analytic hierarchy process
Featured Image
Photo by Mazhar Zandsalimi on Unsplash
Why is it important?
Risk analysis is an essential step in floodwater resources utilization. Through risk analysis, appropriate measures should be taken to increase the security and controllability of water resources utilization under the lower disaster risk. The risk analysis of floodwater resources utilization is carried out according to the steps of risk identification, risk assessment and risk prevention.
Perspectives
Read the Original
This page is a summary of: Risk analysis of floodwater resources utilization along water diversion project: a case study of the Eastern Route of the South-to-North Water Diversion Project in China, Water Science & Technology Water Supply, September 2019, IWA Publishing,
DOI: 10.2166/ws.2019.127.
You can read the full text:
Contributors
The following have contributed to this page