What is it about?
This paper presents optimal settings of the Back To Back Voltage Source Converters (BTB-VSC) for optimal operation of a power system. The optimization is applied to achieve three objectives which are minimum total power losses, minimum line loading deviation and minimum voltage deviation. The optimization process is applied using Turbulent Flow of Water based Optimization (TFWO) algorithm. The study is applied to the IEEE 68-bus system which is connecting the New England system and New York system. Three scenarios are considered to connect the New York system with New England system using BTB-VSC in comparison with AC lines. The simulation and optimization process are performed using DIgSIENT power factory software application.
Featured Image
Photo by Jeremy Bishop on Unsplash
Why is it important?
The paper discusses back to back voltage source converters, minimum power losses, minimum loading deviation, minimum voltage deviation and doctor and patient optimization.
Perspectives
Read the Original
This page is a summary of: Optimal Settings of BTB-VSC in Interconnected Power System Using TFWO, June 2021, Institute of Electrical & Electronics Engineers (IEEE),
DOI: 10.1109/isie45552.2021.9576491.
You can read the full text:
Resources
Contributors
The following have contributed to this page