What is it about?

This model shows a strong relationship between the design and construction phases by using BIM in the design phase and UAVs in the construction phase.

Featured Image

Why is it important?

This model allows safety specialists to identify hazards and develop suitable mitigation strategies.

Read the Original

This page is a summary of: The Effectiveness of an Integrated BIM/UAV Model in Managing Safety on Construction Sites, International Journal of Occupational Safety and Ergonomics, July 2018, Taylor & Francis,
DOI: 10.1080/10803548.2018.1504487.
You can read the full text:

Read

Contributors

The following have contributed to this page