What is it about?
This paper presents a green supply chain inventory model for integrated production of new items and remanufacturing of redeemable returned items under a situation in which the vendor provides the buyer with a permissible delay of payments and supplies the serviceable items to the buyer on lot-for-lot basis.
Featured Image
Why is it important?
It is assumed that every member of the chain is ready to collaborate for the maximum benefit of the supply chain. A mathematical formulation is developed to derive the optimal number of deliveries and the replenishment cycle time for the integrated vendor-buyer inventory model.
Perspectives
Read the Original
This page is a summary of: A green supply chain model of vendor and buyer for remanufacturing, RAIRO - Operations Research, October 2017, EDP Sciences,
DOI: 10.1051/ro/2016077.
You can read the full text:
Contributors
The following have contributed to this page