This paper proposes a simple but very practical methodology to cope with the intermittancy of renewable energies in the short term energy planning.

Featured Image

Why is it important?

In the energy planning stage of a microgrid, there are many considerations that should be taken. For instance, what is the set point power of diesel generators? How should we dispatch the battery energy storage systems? Are these set points deterministic? What does happen if a cloudy situation disrupts our schedule? All these answers are supposed to be addressed by reading this paper. We have tried our best to describe the steps that an operator needs to pursue in order to eradicate the repercussions of renewables intermittancy.

Read the Original

This page is a summary of: A Risk-Averse Energy Management System for Isolated Microgrids ConsideringGeneration and Demand Uncertainties Based on Information Gap Decision Theory, IET Renewable Power Generation, January 2019, the Institution of Engineering and Technology (the IET),
DOI: 10.1049/iet-rpg.2018.5856.
You can read the full text:

Read

Contributors

The following have contributed to this page