What is it about?
We optimize cut scheduling via integer programming by simultaneously considering cut efficiency and order due dates.
Featured Image
Why is it important?
Because not only a cutting process has to be designed to reduce waste of material, but cuts should be scheduled so that orders are fulfilled on time.
Perspectives
Read the Original
This page is a summary of: On cutting stock with due dates, Omega, July 2014, Elsevier,
DOI: 10.1016/j.omega.2014.01.004.
You can read the full text:
Contributors
The following have contributed to this page