Featured Image
Why is it important?
This paper presents mixed integer linear programming models for the problem of scheduling a set of jobs on two parallel machines with a single server. These models are based on the block structure of a feasible schedule, and they outperform the existing models in the literature.
Read the Original
This page is a summary of: Block models for scheduling jobs on two parallel machines with a single server, Computers & Operations Research, January 2014, Elsevier,
DOI: 10.1016/j.cor.2013.08.015.
You can read the full text:
Contributors
The following have contributed to this page