What is it about?

We study problems of scheduling n unit-time jobs on m identical parallel machines, in which a common due window has to be assigned to all jobs. If a job is completed within the due window, then no scheduling cost incurs. Otherwise, a job-dependent earliness or tardiness cost incurs. The job completion times, the due window location and the size are integer valued decision variables. The objective is to find a job schedule as well as the location and the size of the due window such that a weighted sum or maximum of costs associated with job earliness, job tardiness and due window location and size is minimized. We establish properties of optimal solutions of these min-sum and min-max problems and reduce them to polynomially solvable min-sum (traditional) or min-max (bottleneck) assignment problems. In addition, more efficient solution procedures are given for the case in which the due window size cost does not exceed the due window start time cost, the single machine case, the case of proportional earliness and tardiness costs and the case of equal earliness and tardiness costs.

Featured Image

Read the Original

This page is a summary of: Soft due window assignment and scheduling of unit-time jobs on parallel machines, 4OR, May 2012, Springer Science + Business Media,
DOI: 10.1007/s10288-012-0201-4.
You can read the full text:

Read

Contributors

The following have contributed to this page