What is it about?

Wide Area Communication for centralized PMU based applications

Featured Image

Why is it important?

To reduce the overall cost of PMUs and to monitor the critical nodes (lines) for proper transfer of data to monitoring and control center

Perspectives

In real-time PMU placements can be used to transfer data to long distance with reduction in overall cost

Hariprasath Manoharan

Read the Original

This page is a summary of: Economical placement of PMUs considering observability and voltage stability using binary coded ant lion optimization, International Transactions on Electrical Energy Systems, April 2018, Wiley,
DOI: 10.1002/etep.2591.
You can read the full text:

Read

Resources

Contributors

The following have contributed to this page