All Stories

  1. Three parallel task assignment problems with shared resources
  2. Ripple effect quantification by supplier risk exposure assessment
  3. Ripple effect modelling of supplier disruption: integrated Markov chain and dynamic Bayesian network approach
  4. Option contracts for online celebrities as retailers in supply chains
  5. Selected surveys on cutting edge problems in Production Research
  6. Optimisation of the aggregation and execution rates for intersecting operation sets: an example of machining process design
  7. Does the ripple effect influence the bullwhip effect? An integrated analysis of structural and operational dynamics in the supply chain
  8. Blockchain-oriented dynamic modelling of smart contract design and execution in the supply chain
  9. Integrated production planning and quality control for linear production systems under uncertainties of cycle time and finished product quality
  10. Design for manufacturing and assembly/disassembly: joint design of products and production systems
  11. Sample average approximation for multi-vehicle collection–disassembly problem under uncertainty
  12. Low-Certainty-Need (LCN) supply chains: a new perspective in managing disruption risks and resilience
  13. Comparative Analysis of Heuristic Algorithms Used for Solving a Production and Maintenance Planning Problem (PMPP)
  14. The impact of digital technology and Industry 4.0 on the ripple effect and supply chain risk analytics
  15. General parametric scheme for the online uniform machine scheduling problem with two different speeds
  16. Minimizing the Number of Workers in a Paced Mixed-Model Assembly Line
  17. Optimal Control Algorithms and Their Analysis for Short-Term Scheduling in Manufacturing Systems
  18. Dynamic optimisation for highly agile supply chains in e-procurement context
  19. Scheduling in production, supply chain and Industry 4.0 systems by optimal control: fundamentals, state-of-the-art and applications
  20. Recent advances and opportunities in sustainable food supply chain: a model-oriented review
  21. Leading scholars in Production Research for the 55th volume anniversary of IJPR
  22. Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty
  23. Optimal workforce assignment to operations of a paced assembly line
  24. Simulation Vs. Optimization Approaches to Ripple Effect Modelling in the Supply Chain
  25. Optimal due date quoting for a risk-averse decision-maker under CVaR
  26. Scheduling of truck arrivals, truck departures and shop-floor operation in a cross-dock platform, based on trucks loading plans
  27. Optimising integrated inventory policy for perishable items in a multi-stage supply chain
  28. Scheduling of recovery actions in the supply chain with resilience analysis considerations
  29. Planned lead times optimization for multi-level assembly systems under uncertainties
  30. Disruptions in logistics systems and how reduce them: a survey
  31. Artificial intelligence in engineering risk analytics
  32. Supply chain coordination through integration of innovation effort and advertising support
  33. A multi-period inventory transportation model for tactical planning of food grain supply chain
  34. An efficient two-phase iterative heuristic for Collection-Disassembly problem
  35. Analysis of a multicriterial buffer capacity optimization problem for a production line
  36. Optimal control representation of the mathematical programming model for supply chain dynamic reconfiguration
  37. Random lead times in replenishment planning for single-level assembly systems: The value of information
  38. Some new ideas for assembly line balancing research
  39. Literature review on disruption recovery in the supply chain
  40. Minimizing the number of stations and station activation costs for a production line
  41. Using common weights and efficiency invariance principles for resource allocation and target setting
  42. A Dynamic Approach to Multi-stage Job Shop Scheduling in an Industry 4.0-Based Flexible Assembly System
  43. Collection-disassembly problem in reverse supply chain
  44. Hybrid Fuzzy-Probabilistic Approach to Supply Chain Resilience Assessment
  45. Approvisionnement d’une chaîne logistique agile. Une approche d’optimisation dynamique
  46. 55th anniversary of Production Research
  47. Optimal supply planning for two-levels assembly system with stochastic lead-times and maintenance actions
  48. Stability radii of optimal assembly line balances with a fixed workstation set
  49. Integrated process planning and system configuration for mixed-model machining on rotary transfer machine
  50. Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach
  51. Prise en compte de l’état des produits pour la planification de leur désassemblage
  52. A solution approach based on beam search algorithm for disassembly line balancing problem
  53. A new effective dynamic program for an investment optimization problem
  54. Decision support for design of reconfigurable rotary machining systems for family part production
  55. Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations
  56. Disruption-driven supply chain (re)-planning and performance impact assessment with consideration of pro-active and recovery policies
  57. Knapsack problem with objective value gaps
  58. Robust dynamic schedule coordination control in the supply chain
  59. Dynamic recovery policies for time-critical supply chains under conditions of ripple effect
  60. Low carbon economy and equitable society: production, supply chain, and operations management perspectives
  61. Schedule robustness analysis with the help of attainable sets in continuous flow problem under capacity disruptions
  62. Optimization Approaches for Multi-level Assembly Systems Under Stochastic Lead Times
  63. A multi-objective approach for design of reconfigurable transfer lines
  64. Cross-docking Operation Scheduling: Truck Arrivals, Shop-Floor Activities and Truck Departures
  65. Design of a Multi-agent System to Manage Relay Intercity Freighting
  66. Disruptions in supply chains and recovery policies: state-of-the art review
  67. Heuristics for Batch Machining at Reconfigurable Rotary Transfer Machines
  68. Optimization of the Structure and Execution Modes of Intersecting Operation Sets
  69. Towards green automated production line with rotary transfer and turrets: a multi-objective approach using a binary scatter tabu search procedure
  70. Workforce minimization for a mixed-model assembly line in the automotive industry
  71. Approximate solution of a profit maximization constrained virtual business planning problem
  72. Decision making in enterprise risk management: A review and introduction to special issue
  73. Enumerations and stability analysis of feasible and optimal line balances for simple assembly lines
  74. Second order conic approximation for disassembly line design with joint probabilistic constraints
  75. Flow line balancing problem: A survey
  76. A review on the buyer–supplier dyad relationships in sustainable procurement context: past, present and future
  77. Ergonomics in assembly line balancing based on energy expenditure: a multi-objective model
  78. Lateral inventory transshipment problem in online-to-offline supply chain
  79. Single-period inventory model for one-level assembly system with stochastic lead times and demand
  80. Cost optimization for series–parallel execution of a collection of intersecting operation sets
  81. A decomposition based solution algorithm for U-type assembly line balancing with interval data
  82. Two-station single-track railway scheduling problem with trains of equal speed
  83. Structural quantification of the ripple effect in the supply chain
  84. Distribution and operation planning at a cross-dock platform: A case of study at Renault
  85. Re-balancing problem for assembly lines: new mathematical model and exact solution method
  86. A dynamic model and an algorithm for short-term supply chain scheduling in the smart factory industry 4.0
  87. Coordination of Collection and Disassembly Planning for End-of-Life ProductÕ
  88. A bibliographic review of production line design and balancing under uncertainty
  89. A memetic algorithm for a stochastic lot-sizing and sequencing problem
  90. A review of cost and profit oriented line design and balancing problems and solution approaches
  91. Assembly line balancing with ergonomics paradigms: two alternative methods
  92. Cooperative control in production and logistics
  93. Minimizing the number of workers for one cycle of a paced production line
  94. Optimizing Series-Parallel Execution of Intersecting Blocks of Operations
  95. Ripple Effect in the Time-Critical Food Supply Chains and Recovery Policies
  96. Supply Chain Design With Disruption Considerations: Review of Research Streams on the Ripple Effect in the Supply Chain
  97. Supply planning for multi-levels assembly system under random lead times
  98. Variety-oriented design of rotary production systems
  99. Foreword
  100. Cash flow risk in dual-channel supply chain
  101. Integration of aggregate distribution and dynamic transportation planning in a supply chain with capacity disruptions and the ripple effect consideration
  102. A sample average approximation method for disassembly line balancing problem under uncertainty
  103. An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
  104. Combinatorial techniques to optimally customize an automated production line with rotary transfer and turrets
  105. A new graphical approach for solving single-machine scheduling problems approximately
  106. Minimizing setup costs in a transfer line design problem with sequential operation processing
  107. An exact optimization approach for a transfer line reconfiguration problem
  108. A Graphical Approach to Solve an Investment Optimization Problem
  109. Integrated Procurement–Disassembly Problem
  110. Dealing with uncertainty in disassembly line design
  111. Disassembly Line Balancing and Sequencing under Uncertainty
  112. Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem
  113. Reducing the Research Space of Possible Order Release Dates for Multi-level Assembly Systems under Stochastic Lead Times
  114. The Ripple effect in supply chains: trade-off ‘efficiency-flexibility-resilience’ in disruption management
  115. In 2012IJPRpublished its 50th volume
  116. A bibliography of non-deterministic lot-sizing models
  117. Outsourcing: definitions and analysis
  118. Genetic algorithm for balancing reconfigurable machining lines
  119. Balancing reconfigurable machining lines via a set partitioning model
  120. Integrated configurable equipment selection and line balancing for mass production with serial–parallel machining systems
  121. A decomposition method for stochastic partial disassembly line balancing with profit maximization
  122. Lot-sizing on a single imperfect machine: ILP models and FPTAS extensions
  123. Two-dedicated-machine scheduling problem with precedence relations to minimize makespan
  124. Multi-stage supply chain scheduling with non-preemptive continuous operations and execution control
  125. Assembly line balancing under uncertainty: Robust optimization models and exact solution method
  126. Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint
  127. A taxonomy of line balancing problems and their solutionapproaches
  128. Efficiency evaluation model with constraint resource: an application to banking operations
  129. Stability measure for a generalized assembly line balancing problem
  130. A Graphical Approach for Solving Single Machine Scheduling Problems Approximately
  131. A Stochastic Formulation of the Disassembly Line Balancing Problem
  132. A Transfer Line Design Problem with Setup Times and Costs
  133. APPLICATION OF CONTROL THEORETIC TOOLS TO SUPPLY CHAIN DISRUPTION MANAGEMENT
  134. Assembly Line Balancing: Conventional Methods and Extensions
  135. Integrated Decision Making in Flow Line Balancing
  136. Integration of additional purchase cost to reduce the lead time uncertainty for one level assembly system
  137. L-shaped Algorithm for Stochastic Disassembly Line Balancing Problem
  138. Mathematical Model for Supply Planning of Multi-level Assembly Systems with Stochastic Lead Times
  139. Multi-disciplinary analysis of interfaces "Supply Chain Event Management - RFID - control theory"
  140. Optimization of Multi-tool Cutting Modes in Multi-item Batch Manufacturing System
  141. Parallel Machining of Multiple Parts on Rotary Transfer Machines with Turrets
  142. Stable optimal line balances with a fixed set of the working stations
  143. Supply planning and inventory control under lead time uncertainty: A review
  144. Robust balancing of straight assembly lines with interval task times
  145. A decision support system for design of mass production machining lines composed of stations with rotary or mobile table
  146. A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
  147. Algorithms and implementation of a set partitioning approach for modular machining line design
  148. Multi-product sequencing and lot-sizing under uncertainties: A memetic algorithm
  149. Reduction approaches for a generalized line balancing problem
  150. A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines
  151. Balancing of simple assembly lines under variations of task processing times
  152. Scenario based robust line balancing: Computational complexity
  153. Complexity of Buffer Capacity Allocation Problems for Production Lines with Unreliable Machines
  154. Equipment Location in Machining Transfer Lines with Multi-spindle Heads
  155. Complex Optimization Problems in Locational Analysis and Scheduling
  156. Guest Editorial Special Section on Radio Frequency Identification
  157. A branch and bound algorithm for the response time variability problem
  158. Single machine scheduling with precedence constraints and positionally dependent processing times
  159. A mathematical model for a reconfiguration problem of transfer machining lines
  160. An Intelligent PLM System for Machining Environment
  161. ATTAINABLE SETS AND THEIR POSSIBLE APPLICATIONS TO SUPPLY CHAIN ANALYSIS
  162. Balancing reconfigurable machining lines by means of set partitioning model
  163. Intelligent Identification Algorithms for Frequency/Power Control in Smart Grid
  164. Line configuration to minimize setup costs
  165. Optimal Design of Rotary Transfer Machines with Turrets
  166. Optimization of Multi-tool Cutting Modes for Batch Manufacturing in Large Series Machining Environment
  167. Production Lot Sizes on a Single Imperfect Machine: FPTAS vs ILP models
  168. Radio Frequency IDentification (RFID) in Supply Chain: Technolog and Concerns
  169. Min–max and min–max (relative) regret approaches to representatives selection problem
  170. Applicability of optimal control theory to adaptive supply chain planning and scheduling
  171. Enhanced mixed integer programming model for a transfer line design problem
  172. Optimal design of machines processing pipeline parts
  173. Passing the torch
  174. Combinatorial design of a minimum cost transfer line
  175. Multi-Objective Approach for Production Line Equipment Selection
  176. The complexity of dissociation set problems in graphs
  177. On the complexity of the independent set problem in triangle graphs
  178. Scheduling with due date assignment under special conditions on job processing
  179. Optimal time phasing and periodicity for MRP with POQ policy
  180. Modelling transfer line design problem via a set partitioning problem
  181. Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
  182. A new model for equipment selection and transfer line design problem
  183. ON APPLICABILITY OF OPTIMAL CONTROL THEORY TO ADAPTIVE SUPPLY CHAIN PLANNING AND SCHEDULING
  184. Equilibrage de lignes de production
  185. Metaheuristic approaches for the design of machining lines
  186. Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
  187. Multi-product lot-sizing and sequencing on a single imperfect machine
  188. Scheduling problems with partially ordered jobs
  189. Multi-product lot sizing and scheduling on unrelated parallel machines
  190. A MIP approach for balancing transfer line with complex industrial constraints
  191. Pricing strategies and models
  192. Special section: Planning and control of manufacturing and logistic systems
  193. Supply Chain Engineering
  194. Balancing lines with CNC machines: A multi-start ant based heuristic
  195. Balancing Mass Production Machining Lines with Genetic Algorithms
  196. MRP Offsetting for Assembly Systems with Random Component Delivery Times: A Particular Case
  197. Post-optimal analysis for a design problem of machining lines
  198. Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
  199. Manipulator motion planning for high-speed robotic laser cutting
  200. Branch and bound algorithm for a transfer line design problem: Stations with sequentially activated multi-spindle heads
  201. Genetic algorithm for supply planning in two-level assembly systems with random lead times
  202. Qualitative stability analysis of an optimal balance for an assembly line with fixed stations number
  203. A continuous model for supply planning of assembly systems with stochastic component procurement times
  204. Comparison of exact and heuristic methods for a transfer line balancing problem
  205. Introduction to design and analysis of production systems
  206. Configuration des lignes d'usinage à boîtiers multibroches : une approche mixte
  207. Optimisation of Machining Lines Composed of Unit-Built Machines
  208. Genetic algorithms for a supply management problem: MIP-recombination vs greedy decoder
  209. Minimizing makespan for multi-spindle head machines with a mobile table
  210. Cutting edge of the French production research community
  211. Graph approach for optimal design of transfer machine with rotary table
  212. Some new results on the analysis and simulation of bucket brigades (self-balancing production lines)
  213. On the Complexity of Dissociation Set Problems in Graphs
  214. A GRASP heuristic for Sequence-Dependent Transfer Line Balancing Problem
  215. An approach to transfer line balancing via a special set partitioning problem
  216. Balancing modular transfer lines with serial–parallel activation of spindle heads at stations
  217. Due Date Assignment and Scheduling under Special Conditions on Job Processing
  218. Generalized Newsboy model for MRP parameterization under uncertainties
  219. Multi-product lot-sizing and scheduling on unrelated parallel machines to minimize makespan
  220. Optimisation of Machining Lines Composed of Unit-built Machines
  221. Stochastic Dynamic Pricing Models of Monopoly Systems
  222. Optimal supply planning in MRP environments for assembly systems with random component procurement times
  223. A heuristic multi-start decomposition approach for optimal design of serial machining lines
  224. Control of chaos in agent based manufacturing systems
  225. Planned lead times for one-level assembly system with service level constraint
  226. Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint
  227. Extended beta-binomial model for demand forecasting of multiple slow-moving inventory items
  228. A random search and backtracking procedure for transfer line balancing
  229. Planned lead time optimization in material requirement planning environment for multilevel production systems
  230. Exact and heuristic algorithms for balancing transfer lines when a set of available spindle heads is given
  231. Demand forecasting for multiple slow-moving items with short requests history and unequal demand variance
  232. A stochastic model for operating room planning with elective and emergency demand for surgery
  233. On the performance of binomial and beta-binomial models of demand forecasting for multiple slow-moving inventory items
  234. Optimisation of multi-position machines and transfer lines
  235. Emergent Chaotic Behaviour in Agent Based Manufacturing Systems
  236. Forecasting risk analysis for supply chains with intermittent demand
  237. Lot-Sizing and Sequencing on a Single Imperfect Machine
  238. Editorial
  239. Partie II. Une approche multicritère
  240. Partie I. Cas monocritère
  241. An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
  242. HBBA: hybrid algorithm for buffer allocation in tandem production lines
  243. Une généralisation du Modèle Normatif des lignes auto-équilibrées (« bucket brigades »)
  244. Optimization of power transmission systems using a multi-level decomposition approach
  245. Efficiently solvable cases of quadratic assignment problem with generalized monotonic and incomplete anti-monge matrices
  246. Special section: Advances in manufacturing systems and logistics
  247. Supply planning under uncertainties in MRP environments: A state of the art
  248. Integer programming models for logical layout design of modular machining lines
  249. Supply Planning in Multilevel Assembly Systems Under Lead Times uncertainties
  250. MIP approach to balancing transfer lines with blocks of parallel operations
  251. Balancing large-scale machining lines with multi-spindle heads using decomposition
  252. A Supply Planning Model for Multilevel Assembly Systems Under Random Lead Times
  253. A Decomposition Method for Transfer Line Life Cycle Cost Optimisation
  254. Guest Editorial
  255. Cluster-level operations planning for the out-of-position robotic arc-welding
  256. A special case of transfer lines balancing by graph approach
  257. Balancing Assembly and Transfer Lines
  258. Stability analysis of an optimal balance for an assembly line with fixed cycle time
  259. Heuristic Methods to Solve the Alternative Subgraphs Assembly Line Balancing Problem
  260. Preface
  261. Decomposition approach for a problem of lot-sizing and sequencing under uncertainties
  262. A heuristic approach for transfer lines balancing
  263. A survey of the self-balancing production lines (?bucket brigades?)
  264. Editorial
  265. Manufacturing process planning for robotic arc-welding station with positioning table
  266. Conception de systèmes de fabrication : prototype d'un logiciel d'aide à la décision
  267. Editorial
  268. The MPS parameterization under lead time uncertainty
  269. Multiobjective optimization of robot motion for laser cutting applications
  270. Kinematic aspects of a robot-positioner system in an arc welding application
  271. Une heuristique d'optimisation globale basée sur laΨ-transformation
  272. A model for supply planning under lead time uncertainty
  273. Generalized newsboy model to compute the optimal planned lead times in assembly systems
  274. Guest Editorial: Modelling, planning and scheduling of manufacturing systems
  275. State of art of optimization methods for assembly line design
  276. Planification de systèmes d'assemblage avec approvisionnements aléatoires en composants
  277. A combined heuristic approach for optimization of a class of machining lines
  278. Organization of the modeling and simulation of the discrete processes
  279. Balancing production lines composed by series of workstations with parallel operations blocks
  280. Minimisation of equipment cost for transfer lines with blocks of parallel tasks
  281. Computer-aided programming of robotic manufacturing cells for laser cutting applications