All Stories

  1. Bibliometric AI for predicting soil liquefaction
  2. Ensemble Learning Methods for Soil Liquefaction
  3. AutoML for slope stability prediction
  4. Reverse Engineering in Electroless Coatings: An Application on Bath Parameter Optimization for User-Defined Ni-B-P Coating Properties
  5. Sentiment Analysis of Twitter Data of Hepsiburada E-commerce Site Customers with Natural Language Processing
  6. Short-Term Wind Speed Forecasting Using Nonlinear Autoregressive Neural Network: A Case Study in Kocaeli-Türkiye
  7. Using AI to predict soil liquefaction risk
  8. Due-Date Assignment
  9. Dynamic Integrated Process Planning and Scheduling
  10. Dynamic Integrated Process Planning, Scheduling, and Due-Date Assignment
  11. Integrated Process Planning and Scheduling
  12. Integrated Process Planning, Scheduling, Due-Date Assignment, and Delivery
  13. Integrated Process Planning, Scheduling, and Due-Date Assignment
  14. Integrated Process Planning, Scheduling, and Due-Date Assignment
  15. Introduction to Integrated Process Planning, Scheduling, and Due-Date Assignment
  16. Process Planning
  17. Scheduling in Manufacturing
  18. Scheduling with Due-Date Assignment
  19. Scheduling with Due-Window Assignment
  20. Solution Techniques in Integrated Manufacturing Functions
  21. Stock Closing Price Prediction with Machine Learning Algorithms: PETKM Stock Example In BIST
  22. Optimizing tire production using Ant Colony Algorithm.
  23. Optimization of Au(iii) adsorption by the Taguchi method using pyrogallol functionalized silica nanoparticles
  24. A new approach to design S-box generation algorithm based on genetic algorithm
  25. A Novel Hypogenetic Chaotic Jerk System: Modeling, Circuit Implementation, and Its Application
  26. Dynamic integrated process planning, scheduling and due date assignment (DIPPSDDA)
  27. Concurrent solution of WATC scheduling with WPPW due date assignment for environmentally weighted customers, jobs and services using SA and its hybrid
  28. Modelling Porosity Permeability of Ceramic Tiles using Fuzzy Taguchi Method
  29. SOLVING PROCESS PLANNING, WEIGHTED APPARENT TARDINESS COST DISPATCHING, AND WEIGHTED PROCESSING PLUS WEIGHT DUE-DATE ASSIGNMENT SIMULTANEOUSLY USING A HYBRID SEARCH
  30. Optimum Tire Selection with Grey Relational Analysis
  31. İmalat Firmalarında İş Sağlığı ve Güvenliği Yatırım Harcamaları İle Kaza Oranları ve İş Kazası Maliyetleri İlişkisi: İşletme Bütçesine İSG Harcamaları İçin Kaynak Tahsis Edilmesinin Önemi
  32. FİRMA BÜYÜKLÜĞÜNÜN 6331 SAYILI İŞ SAĞLIĞI VE GÜVENLİĞİ KANUNU KAPSAMINDA BİREYSEL VE ÖRGÜTSEL SONUÇLAR ÜZERİNDEKİ ETKİSİ: İMALAT FİRMALARI ÜZERİNDE BİR ARAŞTIRMA
  33. PROCESS PLANNING AND WEIGHTED SCHEDULING WITH WNOPPT WEIGHTED DUE-DATE ASSIGNMENT USING HYBRID SEARCH FOR WEIGHTED CUSTOMERS
  34. Dynamic bottleneck elimination in mattress manufacturing line using theory of constraints
  35. An investigation on competitiveness in services: Turkey versus European Union
  36. Competitiveness in Services: Turkey Versus European Union